Check category

What should be paid attention to when installing the carton baler

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-03-06 14:19
  • Views:

(Summary description)Wastebasket baling press which problems should be paid attention to when installation, wastebasket baling press frame of 4 sets of wire device installed in a framework, the center of the lead frame axis relative to hang a crushing, crushing the horizontal movement of the hydraulic motor function, crushing of welding, the bottom of the wheels, the horizontal motion of hydraulic cylinder of driving along a guide rail. The lifting platform is mainly driven by two beam bolts and can be moved up and down in the vertical direction in 2 hydraulic cylinder lifting platforms.

What should be paid attention to when installing the carton baler

(Summary description)Wastebasket baling press which problems should be paid attention to when installation, wastebasket baling press frame of 4 sets of wire device installed in a framework, the center of the lead frame axis relative to hang a crushing, crushing the horizontal movement of the hydraulic motor function, crushing of welding, the bottom of the wheels, the horizontal motion of hydraulic cylinder of driving along a guide rail. The lifting platform is mainly driven by two beam bolts and can be moved up and down in the vertical direction in 2 hydraulic cylinder lifting platforms.

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-03-06 14:19
  • Views:
Information
Wastebasket baling press which problems should be paid attention to when installation, wastebasket baling press frame of 4 sets of wire device installed in a framework, the center of the lead frame axis relative to hang a crushing, crushing the horizontal movement of the hydraulic motor function, crushing of welding, the bottom of the wheels, the horizontal motion of hydraulic cylinder of driving along a guide rail. The lifting platform is mainly driven by two beam bolts and can be moved up and down in the vertical direction in 2 hydraulic cylinder lifting platforms.
 
Waste carton baler equipment pressure frame and pressure frame structure is similar, but the above arrangement of four groups of heads, a set of wire feeding device. The hydraulic baler baler head is the most complex, most of the chain action on the entire structure of the equipment, the hydraulic baler head structure is the same, can be exchanged. A total of 4 sets of wire feeding devices, each corresponding to a packaging head, each including packaging line transport equipment and packaging line anti-tension device.
 
The hydraulic waste carton baler consists mainly of two main bases on the surface equipped with wear-resistant rails. The pressure frame wheel along the two outer tracks pushes the hydraulic cylinder set in the pressure frame operation. In addition to mechanical components and a set of hydraulic stations. From the above description, it can be seen that all the movement of the hydraulic baler is completed by fluid power. What should be paid attention to when installing the carton baler

Scan the QR code to read on your phone

Linqing Zhongci Machinery Co. LTD

Linqing Zhongci Machinery Co. LTD. Is located in the northwest plain of the wei canal. Linqing is a famous historical and cultural city with beautiful scenery. The beijing-kowloon railway and the german-commercial expressway run through the downtown area of linqing city. 

Quick navigation

 

Home

About Us

News

Products

Contact Us

临清市忠磁机械有限公司

Shandong linqing xinhua office for the west store

COPYRIGHT©Linqing Zhongci Machinery Co. LTD  鲁ICP备16028133号-1  Powered by www.300.cn  jinan